Fabrick: Case Study

16th September

Project: Head Office 3 – Fabrick, Cheadle

Project Budget: £220,000

Project Location: Fabrick, Warren Road, Cheadle Hulme, SK8 5BR

Project Objective: To complete flooring works to a refurb of an existing office block, into high specification apartments.

Work Completed: Woodpecker Quintesse 148 Pure Wood Flooring was installed to all kitchen and living spaces. Cormar Primo Plus in French Grey was installed to all bedrooms. Burmatex Tivoli was installed to all corridors and stairs, and QA Luvanto Click flooring in Country Oak was installed in the communal lounge.

Project Outcome: This project was achieved by making regular site visits to ensure all of our works were being carried out to the best possible standard. Keeping in regular contact with the Site Management team was vital to ensure our programme of works was adhered to at all times.

  