The Hut Group: Case Study

20th March

Take a look at our recent work at Manchester Airport for The Hut Group! 

Project Name: ADT Workplace – The Hut Group

Project Budget: £300k

Project Timescales: There was six floors in total with approximately three weeks per floor. We carried out the first floor within eight days!

Project Location: Manchester Airport

Project Objectives: We were tasked with the supply and install of new floor coverings within tight timescales.

Work Completed: Each floor ranges between 1000 metre squared to 1400 metre squared. We installed 6mm SP101 flooring, grade plywood to RAF which was then overlaid with acoustic underlay in preperation for the Frobo Sphera Vinyl sheet to be installed laid throughout.

Project Outcome: We worked in collaboration with the main contractor’s site team and other contractors to ensure that areas were ready for the flooring installation, in the minimum amount of time required to keep the tight programme on track. For the first floor we arranged to have both day and night shift in order to get all floor coverings down within an eight day period.

If you’re looking for a commercial flooring company that works to the highest standards and goes the extra mile to meet the specifics of your project, call us on 0161 477 5580 or get in touch via our website.

Testimonials